Cover 200T-1702012-Y For FAST

Cover 200T-1702012-Y For FAST

Cover 200T-1702012-Y For FAST
Send Inquiry
Description
Technical Parameters

Cover 200T-1702012-Y For FAST
Installation process
Using guide pins to assist in aligning the housing positioning holes, slowly lower the upper cover assembly to avoid colliding with the sealing ring.
Bolt tightening
Use a 16mm open-end wrench to pre tighten the fixing bolts diagonally.
Complete the final tightening in three incremental torque steps (recommended sequence: center → diagonal → edge).
Gearshift mechanism connection
When installing the gear shift rocker arm, ensure that the pin hole is aligned with the dial synchronization pin
After installing the dust cover, press the edge to eliminate air.

 

Product Deatials

 

Part Name Cover Part Number 200T-1702012-Y
Model / Application For FAST
Package Size / GW

1kg

MOQ 1 PC Brand Name CBP

 

 

Hot Tags: cover 200t-1702012-y for fast, China cover 200t-1702012-y for fast manufacturers, factory, excavator ball bearing parts, steel paver parts, digging machine parts, excavator control valve parts, , excavator valve parts