Cover 200T-1702012-Y For FAST
Installation process
Using guide pins to assist in aligning the housing positioning holes, slowly lower the upper cover assembly to avoid colliding with the sealing ring.
Bolt tightening
Use a 16mm open-end wrench to pre tighten the fixing bolts diagonally.
Complete the final tightening in three incremental torque steps (recommended sequence: center → diagonal → edge).
Gearshift mechanism connection
When installing the gear shift rocker arm, ensure that the pin hole is aligned with the dial synchronization pin
After installing the dust cover, press the edge to eliminate air.
Product Deatials
| Part Name | Cover | Part Number | 200T-1702012-Y |
| Model | / | Application | For FAST |
| Package Size | / | GW |
1kg |
| MOQ | 1 PC | Brand Name | CBP |
Hot Tags: cover 200t-1702012-y for fast, China cover 200t-1702012-y for fast manufacturers, factory, excavator ball bearing parts, steel paver parts, digging machine parts, excavator control valve parts, , excavator valve parts





