Installation Guide for Power Steering Pipe Joint Bolt 00A0046 (P/N ZL50C.2.2-11A)
Preparation: Ensure hydraulic system is depressurized. Clean mating surfaces with solvent and inspect threads for damage.
Lubrication: Apply anti-seize compound to bolt threads and flange contact area.
Alignment: Hand-tighten bolt into joint to align flanges; ensure parallel gap ≤0.1mm.
Torque Sequence: Use a calibrated torque wrench (20–100 Nm range). Tighten diagonally in 3 stages:
Stage 1: 30±5 Nm.
Stage 2: 60±5 Nm.
Stage 3: Final torque 85±3 Nm.
Post-Installation: Pressurize system to 18±2 MPa and check for leaks. Re-torque after 30 minutes of operation.
Caution: Replace if thread galling occurs.
Product Deatials
| Part Name | Booster Pipe Joint Bolt |
|
00A0046 | |
| Model | ZL50C.2.2-11A | Application | Liugong Wheel Loader | |
| Package Size | / | Weight | 0.1KG | |
| MOQ | 1 SET | Brand Name | CBP |
Hot Tags: 00a0046 zl50c.2.2-11a booster pipe joint bolt for liugong wheel loader, China 00a0046 zl50c.2.2-11a booster pipe joint bolt for liugong wheel loader manufacturers, factory, excavator bearing parts, excavator relay parts, excavator track parts, , steel paver parts, alloy paver parts




